Commercial Renovation

Office, retail and F&B renovation in Singapore, from fit-out and carpentry to electrical, flooring and store fixtures.

A commercial renovation has to look good, work hard and finish on time, because every day of disruption affects your business. Reno Guys renovates offices, shops, F&B outlets and showrooms across Singapore, with carpentry built in our own workshop in Woodlands.

Commercial Spaces We Renovate

  • Offices: workstations, meeting rooms, partitions, pantries, reception counters and storage.
  • Retail shops: display shelving, counters, fitting rooms and feature walls. See our store fixtures.
  • F&B outlets: cafés, restaurants and kiosks, including counters, seating and back-of-house areas. See our restaurant fit-outs.
  • Showrooms and events: display areas, exhibition booths and temporary builds. See our exhibition booths.

Our Commercial Renovation Services

Service What It Includes
Fit-out and partitions Partition walls, ceilings, doors and room layouts
Carpentry Counters, cabinets, shelving, fixtures and furniture
Electrical and lighting Power points, lighting, data points and DB works. See our electrical services.
Flooring Carpet tiles, vinyl and SPC flooring. See our carpet tile installation.
Aircon and ventilation Installation and changes to suit the new layout. See our HVAC services.
Painting and finishes Walls, ceilings, brand-colour walls and signage areas

Approvals and Compliance

Commercial works in Singapore often need approvals that home renovations don’t. Which ones apply depends on your premises and what you are changing:

  • Landlord or building management: most malls, office buildings and industrial landlords need to approve your fit-out plans and set rules on work hours, noisy works, deliveries and protection of common areas.
  • Fire safety: works that affect escape routes, fire doors, sprinklers, fire alarms or ventilation generally need SCDF plan approval before they start. Minor works may qualify for a simpler lodgement route.
  • Building and structural works: building works that need approval require plans submitted to BCA by a Qualified Person (a registered architect or professional engineer).
  • Change of use: if you are turning a space into a different use, such as a shop into an eating place, planning permission from URA may be needed.
  • Licensed trades: electrical work must be done by an EMA-licensed electrical worker, and plumbing by a PUB-licensed plumber. F&B businesses also need the right food shop licence from SFA.

We work with your Qualified Person and building management so the works match the approved plans. Check early which approvals your project needs, because they affect the timeline.

Our Commercial Renovation Process

Step What Happens
1. Brief We discuss your business needs, brand, headcount or layout, and target opening date.
2. Site survey We measure the unit and check its condition, services and building rules.
3. Design and quotation Layout, materials and an itemised quotation.
4. Approvals Landlord and authority submissions are prepared with your consultants.
5. Build Site works and installation of carpentry made in our workshop.
6. Handover Joint inspection, rectification of defects, cleaning and handover.

What Affects the Cost of Commercial Renovation

Item What Affects the Cost
Floor area Size and layout of the unit
Handover condition Bare unit or existing fit-out
M&E works Electrical, aircon and plumbing scope
Approvals Consultants and submissions needed
Finishes and carpentry Materials, fixtures and detailing
Work hours Night or weekend works required by the building

Note: Every project is different. Contact us for a free, itemised quote based on your exact requirements.

Planning a new office or shop? Request a free quote or WhatsApp us at +65 9731 6300.

FAQs for the Commercial Renovation page

Do I need approval to renovate my office or shop?
Usually yes. Most landlords and building managers must approve your fit-out plans first. Works that affect fire safety, such as escape routes, sprinklers or fire doors, generally need SCDF approval, and a change of use may need URA approval. Your Qualified Person can confirm what applies.
Yes, where the building allows it. Many malls and office buildings require noisy works to be done after hours. We plan the schedule around your operating hours and the building’s rules, and can phase larger jobs so part of your space stays open.
It depends on the size of the space, the scope of work and the approvals needed. A simple office refresh is much quicker than a full fit-out of a bare unit with new M&E works. Authority and landlord approvals can add time, so it helps to start them early. We give you a schedule with your quotation.
Share the unit’s floor plan or address, your landlord’s fit-out guidelines if you have them, the number of staff or seats you need, your brand colours or reference photos, and your target opening date. With these, we can survey the site and give you a more accurate itemised quotation.
Yes. Counters, display shelving, cabinets and booths are designed to your brand and built in our Woodlands workshop, then installed on site. Building off-site keeps dust and noise in your unit to a minimum.

Let's Redesign the way you live

See how we transform homes with careful planning, quality materials, and attention to every detail.

Reno Guys

Ready for a Makeover?