HDB Renovation

Renovation for BTO and resale HDB flats: carpentry, hacking, electrical, flooring, tiling and painting, planned around HDB’s rules.

Whether you have just collected the keys to a new BTO flat or bought a resale flat that needs updating, a good HDB renovation starts with a clear plan. Reno Guys handles HDB renovation across Singapore, from 3-room flats to Executive apartments, with carpentry built in our own workshop in Woodlands.

HDB Renovation Services We Handle

BTO Renovation vs Resale HDB Renovation

New BTO Flat Resale HDB Flat
Typical focus Carpentry, flooring, lighting, painting and fittings Hacking, rewiring, re-piping, retiling and new carpentry
Bathrooms Wall and floor finishes can’t be removed for the first 3 years; overlaying is the usual option Finishes can be replaced with an HDB permit
Electrical Usually extra points and lighting Older wiring and DB boxes may need replacing
Main consideration Timing the works around your move-in date Uncovering hidden problems behind old finishes

HDB Renovation Rules You Should Know

HDB’s renovation guidelines protect the building’s structure and your neighbours. The main points for flat owners are:

  • Use a DRC-listed contractor. As a general rule, homeowners should hire a contractor listed on HDB’s Directory of Renovation Contractors for renovation works in an HDB flat, including works that don’t need a permit. You can check the directory on the HDB website before you sign.
  • Get a permit where needed. Hacking or building walls, and replacing floor finishes in bathrooms, need HDB’s approval before work starts. Your contractor can apply on your behalf once you authorise them. A new flat needs a utilities account with SP Services before a permit can be granted.
  • Keep to the work hours. Noisy works such as hacking, tile removal and drilling are limited to set weekday hours and must be completed within a short period. General renovation is allowed within set hours from Monday to Saturday, with no works on Sundays and public holidays.
  • Inform your neighbours. Neighbours within 2 units must get written notice at least 5 days before works start, and HDB’s Notice of Renovation must be displayed outside the flat throughout the works.
  • Don’t touch the structure. Reinforced concrete walls, columns, beams and slabs must not be hacked or altered.
  • Use licensed trades. Electrical work must be done by an EMA-licensed electrical worker, and water and sanitary plumbing by a PUB-licensed plumber.

The rules change from time to time, so always check the latest guidelines on the HDB website before you plan.

Planning Your HDB Renovation Timeline

Stage What Happens
1. Site visit and measurement We measure the flat and discuss your layout, style and priorities.
2. Design and quotation Layout drawings, material choices and an itemised quotation.
3. Permits and notices Permit applications and neighbour notices are prepared.
4. Hacking and wet works Hacking, plumbing, electrical wiring and tiling.
5. Carpentry and flooring Carpentry is installed after wet works, followed by flooring.
6. Painting and handover Painting, lights and fittings, cleaning and a final walk-through.

A BTO flat with mainly carpentry work moves faster than a resale flat that needs hacking and rewiring. We give you a schedule with your quotation so you can plan your move. For older flats, start with this 30-year-old HDB renovation checklist.

Ideas by Flat Type

3-room and 4-room flats

Space is the priority. Full-height wardrobes, platform beds with storage, and an open kitchen where HDB allows it make a compact flat feel larger.

5-room and Executive flats

With more space, homeowners often add a study, a walk-in wardrobe or a feature wall. Older Executive flats often benefit from rewiring and new flooring throughout.

What Affects the Cost of HDB Renovation

Item What Affects the Cost
Flat type Number of rooms and floor area
New or resale Condition of existing finishes
Hacking Walls, tiles and built-ins removed
Carpentry Length, material and finish
Electrical and plumbing Rewiring, new points, re-piping
Materials Tiles, flooring, fittings and paint

Note: Every flat is different. Contact us for a free, itemised quote based on your exact requirements. To see how the unit’s condition, not a package price, should shape the budget, read our older resale flat renovation budget guide.

Ready to plan your flat? Request a free quote or WhatsApp us at +65 9731 6300.

FAQs for the HDB Renovation page

Do I need a permit to renovate my HDB flat?
It depends on the work. Hacking or building walls, and replacing bathroom floor finishes, need HDB’s approval before work starts. Carpentry, painting and laying vinyl over tiles generally don’t need a permit, but must still follow HDB’s guidelines and be done by a DRC-listed contractor.
It depends on the scope. A new BTO flat with mainly carpentry, flooring and lighting is quicker than a resale flat that needs hacking, rewiring and retiling. Permit approval, HDB’s noisy-work hours and carpentry fabrication time all affect the schedule. We give you a timeline with your quotation.
Only with HDB’s prior written approval. Some internal walls can be removed, but structural walls, columns, beams and slabs can never be hacked. The hacking must be done by certified workers. Your contractor submits the layout plans with the permit application.
For light work such as carpentry or painting, many owners stay on. During hacking, tiling and wet works there is dust, noise and limited water and power, so most families stay elsewhere for that stage. We can phase the work to keep one room or bathroom usable where possible.
Not by hacking. Newly built flats have a 3-year restriction on removing bathroom and toilet wall and floor finishes. You can still overlay new tiles, change the vanity, fittings and lighting, and add storage during this period.

Let's Redesign the way you live

See how we transform homes with careful planning, quality materials, and attention to every detail.

Reno Guys

Ready for a Makeover?